[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-581-12":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":601},{"id":5,"name":6,"category":7,"favorite":8},581,"建设工程造价管理基础知识","建筑工程",0,12,50,2873,[13,34,46,58,70,82,94,106,118,129,141,149,161,173,185,197,208,220,232,244,256,268,280,292,304,316,328,340,352,364,376,388,400,412,424,436,445,455,467,479,488,497,509,521,529,541,553,565,577,589],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},895343,1,"单选题","进行流动资产投资估算时，通常计算的是各项流动资金的（ ）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","各项流动资金的年库存量",false,{"key":24,"text":25,"correct":22},"B","各项流动资金的年周转次数",{"key":27,"text":28,"correct":22},"C","各项流动资金的年周转额度",{"key":30,"text":31,"correct":32},"D","各项流动资金年平均占用额度",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},895344,"在国外项目投资估算中，有初步的工艺流程图、主要生产设备的生产能力及项目建设的地理位置等条件，可套用相近规模厂的单位生产能力建设费用来估算拟建项目所需的投资额。以上投资估算方法适用于( )阶段。",[38,40,42,44],{"key":20,"text":39,"correct":22},"项目的投资设想",{"key":24,"text":41,"correct":32},"项目的投资机会研究",{"key":27,"text":43,"correct":22},"项目的初步可行性研究",{"key":30,"text":45,"correct":22},"项目的详细可行性研究",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},895345,"项目决策阶段对环境治理方案进行技术经济比较时，不作为比较内容的是（）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"技术水平对比",{"key":24,"text":53,"correct":22},"管理及监测方式对比",{"key":27,"text":55,"correct":32},"安全生产条件对比",{"key":30,"text":57,"correct":22},"环境效益对比",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},895348,"某建设项目建成正常运营后，年销售收入5000 万元,年经营成本3500 万元,外购原材料、燃料及其他材料的年费用1800 万元，应付账款的周转天数60 天。则该项目应付账款年估算额为（）万元。",[62,64,66,68],{"key":20,"text":63,"correct":22},"600",{"key":24,"text":65,"correct":22},"250",{"key":27,"text":67,"correct":32},"300",{"key":30,"text":69,"correct":22},"550",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":27,"analysis":33},895349,"确定项目生产规模的前提是项目的（）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"盈利能力",{"key":24,"text":77,"correct":22},"资金情况",{"key":27,"text":79,"correct":32},"产品市场需求状况",{"key":30,"text":81,"correct":22},"原材料、燃料供应状况",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},895350,"项目建设地区选择应遵循的基本原则之一是（）。",[86,88,90,92],{"key":20,"text":87,"correct":32},"靠近原料和燃料地原则",{"key":24,"text":89,"correct":22},"靠近基础设施便利地区原则",{"key":27,"text":91,"correct":22},"节约土地原则",{"key":30,"text":93,"correct":22},"工业项目集中布局原则",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},895351,"在项目建设各阶段中，投资决策阶段对工程造价的影响达到（）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"60%—90%",{"key":24,"text":101,"correct":32},"70%—90%",{"key":27,"text":103,"correct":22},"70%—80%",{"key":30,"text":105,"correct":22},"60%—80%",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":27,"analysis":33},895352,"投资机会及项目建议书阶段，是初步决策的阶段，投资估算的误差率在（）左右。",[110,112,114,116],{"key":20,"text":111,"correct":22},"±10%",{"key":24,"text":113,"correct":22},"±20%",{"key":27,"text":115,"correct":32},"±30%",{"key":30,"text":117,"correct":22},"±40%",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":27,"analysis":33},895353,"某建设项目投产后,应付账款的最低周转天数为15 天，预计年销售收入为12000 万元，年经营成本9000 万元,其中外购原材料、燃料7200 万元。则该项目的应付账款估算额为（）万元。",[122,124,126,127],{"key":20,"text":123,"correct":22},"500",{"key":24,"text":125,"correct":22},"375",{"key":27,"text":67,"correct":32},{"key":30,"text":128,"correct":22},"125",{"id":130,"libraryId":5,"type":15,"typeLabel":16,"stem":131,"options":132,"answer":30,"analysis":33},895354,"下列关于建筑工程费用估算的说法,不正确的是（）。",[133,135,137,139],{"key":20,"text":134,"correct":22},"单位建筑工程投资估算法是以单位建筑工程费用乘以建筑工程总量来估算建筑工程费的方法",{"key":24,"text":136,"correct":22},"单位实物工程量投资估算法是以单位实物工程量的建筑工程费乘以实物工程总量来估算建筑工程费的方法",{"key":27,"text":138,"correct":22},"建筑工程费占总投资比例较大的项目，可采用概算指标估算法",{"key":30,"text":140,"correct":32},"采用概算指标估算法时投入的时间和工作量较小",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":30,"analysis":33},895355,"下列关于比例估算法的说法，不正确的是（）。",[145,146,147,148],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":22},{"key":27,"text":27,"correct":22},{"key":30,"text":30,"correct":32},{"id":150,"libraryId":5,"type":15,"typeLabel":16,"stem":151,"options":152,"answer":24,"analysis":33},895356,"下列投资估算方法中，属于以设备购置费为基数估算建设项目静态投资的方法是（）。",[153,155,157,159],{"key":20,"text":154,"correct":22},"生产能力指数法",{"key":24,"text":156,"correct":32},"朗格系数法",{"key":27,"text":158,"correct":22},"指标估算法",{"key":30,"text":160,"correct":22},"定额估算法",{"id":162,"libraryId":5,"type":15,"typeLabel":16,"stem":163,"options":164,"answer":20,"analysis":33},895357,"应满足的要求:满足生产使用功能要求;适应已选定的场址（线路走向）；符合工程标准规范要求;经济合理。投资估算分析不包括（）。",[165,167,169,171],{"key":20,"text":166,"correct":32},"过程投资总额分析",{"key":24,"text":168,"correct":22},"工程投资比例分析",{"key":27,"text":170,"correct":22},"分析设备及工器具购置费占建设总投资的比例",{"key":30,"text":172,"correct":22},"分析影响投资的主要因素",{"id":174,"libraryId":5,"type":15,"typeLabel":16,"stem":175,"options":176,"answer":20,"analysis":33},895358,"下列选项中，在选择设备方案时需要注意的是（）。",[177,179,181,183],{"key":20,"text":178,"correct":32},"尽量选用国产设备",{"key":24,"text":180,"correct":22},"尽量选用国外设备",{"key":27,"text":182,"correct":22},"选用国外价格低廉的设备",{"key":30,"text":184,"correct":22},"无需注意设备之间的配套问题",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":24,"analysis":33},895359,"按照形成资产法编制建设投资估算表，下列费用中应列入无形资产费用的是（ ）。",[189,191,193,195],{"key":20,"text":190,"correct":22},"建设单位管理费",{"key":24,"text":192,"correct":32},"土地使用权",{"key":27,"text":194,"correct":22},"生产设备及开办费",{"key":30,"text":196,"correct":22},"引进技术费",{"id":198,"libraryId":5,"type":15,"typeLabel":16,"stem":199,"options":200,"answer":20,"analysis":33},895360,"以拟建项目的主体工程费为基数，以其他工程费与主体工程费的比例系数估算项目静态投资的方法叫（）。",[201,203,205,206],{"key":20,"text":202,"correct":32},"系数估算法",{"key":24,"text":204,"correct":22},"比例估算法",{"key":27,"text":158,"correct":22},{"key":30,"text":207,"correct":22},"扩大指标估算法",{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":30,"analysis":33},895361,"采用分项详细估算法估算项目流动资金时，流动资产的正确构成是（）。",[212,214,216,218],{"key":20,"text":213,"correct":22},"应付账款+预付账款+存货+年其他费用",{"key":24,"text":215,"correct":22},"应付账款+应收账款-存货+现金",{"key":27,"text":217,"correct":22},"应付账款+存货+预收账款+现金",{"key":30,"text":219,"correct":32},"预付账款+现金+应收账款+存货",{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":20,"analysis":33},895362,"对于技术密集型建设项目，选择建设地区应遵循的原则是（）。",[224,226,228,230],{"key":20,"text":225,"correct":32},"选择在大中型发达城市",{"key":24,"text":227,"correct":22},"靠近原料产地",{"key":27,"text":229,"correct":22},"靠近产地消费地",{"key":30,"text":231,"correct":22},"靠近电（能）源地",{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":24,"analysis":33},895363,"可行性研究阶段投资估算的精确度的要求为：误差控制在±（）%以内。",[236,238,240,242],{"key":20,"text":237,"correct":22},"5",{"key":24,"text":239,"correct":32},"10",{"key":27,"text":241,"correct":22},"15",{"key":30,"text":243,"correct":22},"20",{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":30,"analysis":33},895364,"某地拟于2015 年新建一年产60 万吨产品的生产线，该地区2013 年建成的年产50 万吨相同产品的生产线的建设投资额为5000 万元。假定2013 年至2015 年该地区工程造价年均递增5%。则该生产线的建设投资为（）万元。",[248,250,252,254],{"key":20,"text":249,"correct":22},"6000",{"key":24,"text":251,"correct":22},"6300",{"key":27,"text":253,"correct":22},"6600",{"key":30,"text":255,"correct":32},"6615",{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":24,"analysis":33},895365,"对于项目决策和工程造价的关系，下列说法中正确的是（）。",[260,262,264,266],{"key":20,"text":261,"correct":22},"工程造价的正确性是项目决策合理性的前提",{"key":24,"text":263,"correct":32},"项目决策的内容是决定工程造价的基础",{"key":27,"text":265,"correct":22},"投资估算的深度影响项目决策的精确度",{"key":30,"text":267,"correct":22},"投资决策阶段对工程造价的影响程度不大",{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":30,"analysis":33},895366,"关于项目建设地区选择原则的说法，正确的是（）。",[272,274,276,278],{"key":20,"text":273,"correct":22},"应将项目安排在距原料、燃料提供地和产品消费地等距离范围内",{"key":24,"text":275,"correct":22},"各类企业应集中布置，以便形成综合生产能力",{"key":27,"text":277,"correct":22},"工业布局的集聚程度越高越好",{"key":30,"text":279,"correct":32},"相应的生产性和社会性基础设施相配合，以充分发挥其能力和效率",{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":24,"analysis":33},895367,"世界银行贷款项目的投资估算常采用朗格系数法推算建设项目的静态投资，该方法的计算基数是（）。",[284,286,288,290],{"key":20,"text":285,"correct":22},"主体工程费",{"key":24,"text":287,"correct":32},"设备购置费",{"key":27,"text":289,"correct":22},"其他工程费",{"key":30,"text":291,"correct":22},"安装工程费",{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":24,"analysis":33},895368,"下列安装工程费估算公式中，适用于估算工业炉窑砌筑和工艺保温或绝热工程安装工程费的是（ ）。",[296,298,300,302],{"key":20,"text":297,"correct":22},"设备原价×设备安装费率（%）",{"key":24,"text":299,"correct":32},"重量（体积、面积）总量×单位重量（体积、面积）安装费指标",{"key":27,"text":301,"correct":22},"设备原件×材料费占设备费百分比×材料安装费率（%）",{"key":30,"text":303,"correct":22},"安装工程功能总量×功能单位安装工程费标准",{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":24,"analysis":33},895369,"下列利用分项详细估算法计算流动资金的公式中，正确的是()。",[308,310,312,314],{"key":20,"text":309,"correct":22},"预收账款=营业收入年金额／预收账款周转次数",{"key":24,"text":311,"correct":32},"应收账款=年经营成本／应收账款周转次数",{"key":27,"text":313,"correct":22},"在产品=（年经营成本-年其他营业费用）／在产品周转次数",{"key":30,"text":315,"correct":22},"预付账款=外购原材料、燃料费用／预付账款周转次数",{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":20,"analysis":33},895370,"柱网布置是否合理，对工程造价和面积的利用效率都有较大影响。建筑设计中对柱网布置应注意()。",[320,322,324,326],{"key":20,"text":321,"correct":32},"适当扩大柱距和跨度能使厂房有更大的灵活性",{"key":24,"text":323,"correct":22},"单跨厂房跨度不变时，层数越多越经济",{"key":27,"text":325,"correct":22},"多跨厂房柱间距不变时，跨度越大造价越低",{"key":30,"text":327,"correct":22},"柱网布置与厂房的高度无关",{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":24,"analysis":33},895371,"按照国家有关规定，作为年度固定资产投资计划、计划投资总额及构成数额的编制和确定依据是()。",[332,334,336,338],{"key":20,"text":333,"correct":22},"经批准的投资估算",{"key":24,"text":335,"correct":32},"经批准的设计概算",{"key":27,"text":337,"correct":22},"经批准的施工图预算",{"key":30,"text":339,"correct":22},"经批准的工程决算",{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":24,"analysis":33},895372,"关于建设项目总概算的编制，下列说法中正确的是()。",[344,346,348,350],{"key":20,"text":345,"correct":22},"项目总概算应按照建设单位规定的统一表格进行编制",{"key":24,"text":347,"correct":32},"工程建设其他费用概算按国家或地区或部委所规定的项目和标准确定，并按统一格式编制",{"key":27,"text":349,"correct":22},"主要建筑安装材料汇总表只需列出建设项目的钢筋、水泥等主要材料各自的总消耗量",{"key":30,"text":351,"correct":22},"总概算编制说明应装订于总概算文件最后",{"id":353,"libraryId":5,"type":15,"typeLabel":16,"stem":354,"options":355,"answer":24,"analysis":33},895373,"单位工程概算按其工作性质可分为单位建筑工程概算和单位设备及安装工程概算两类，下列属于单位设备及安装工程概算的是( )。",[356,358,360,362],{"key":20,"text":357,"correct":22},"通风、空调工程概算",{"key":24,"text":359,"correct":32},"工器具及生产家具购置费概算",{"key":27,"text":361,"correct":22},"电气、照明工程概算",{"key":30,"text":363,"correct":22},"弱电工程概算",{"id":365,"libraryId":5,"type":15,"typeLabel":16,"stem":366,"options":367,"answer":30,"analysis":33},895374,"当建设项目为一个单项工程时，其设计概算应采用的编制形式是（）。",[368,370,372,374],{"key":20,"text":369,"correct":22},"单位工程概算、单项工程综合概算和建设项目总概算二级",{"key":24,"text":371,"correct":22},"单位工程概算和单项工程综合概算二级",{"key":27,"text":373,"correct":22},"单项工程综合概算和建设项目总概算二级",{"key":30,"text":375,"correct":32},"单位工程概算和建设项目总概算二级",{"id":377,"libraryId":5,"type":15,"typeLabel":16,"stem":378,"options":379,"answer":27,"analysis":33},895375,"对于技术复杂、设计有难度的工程通常采用三阶段设计，即()。",[380,382,384,386],{"key":20,"text":381,"correct":22},"方案设计、技术设计和施工图设计",{"key":24,"text":383,"correct":22},"总体设计、技术设计和施工图设计",{"key":27,"text":385,"correct":32},"初步设计、技术设计和施工图设计",{"key":30,"text":387,"correct":22},"总平面设计、工艺设计和建筑设计",{"id":389,"libraryId":5,"type":15,"typeLabel":16,"stem":390,"options":391,"answer":24,"analysis":33},895376,"在工业项目的工艺设计过程中，影响工程造价的主要因素包括()。",[392,394,396,398],{"key":20,"text":393,"correct":22},"生产方法、工艺流程、功能分区",{"key":24,"text":395,"correct":32},"建设规模、标准和产品方案",{"key":27,"text":397,"correct":22},"工艺流程、功能分区、运输方式",{"key":30,"text":399,"correct":22},"工艺流程、原材料供应、运输方式",{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":24,"analysis":33},895377,"下列对于K周从低到高排序正确的是()。",[404,406,408,410],{"key":20,"text":405,"correct":22},"圆形、矩形、L形、T形",{"key":24,"text":407,"correct":32},"圆形、正方形、矩形、L形",{"key":27,"text":409,"correct":22},"矩形、正方形、T形、L形",{"key":30,"text":411,"correct":22},"矩形、长方形、L形、T形",{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":27,"analysis":33},895378,"在住宅小区规划设计中，其核心问题是()。",[416,418,420,422],{"key":20,"text":417,"correct":22},"小区环境优美",{"key":24,"text":419,"correct":22},"经济适用",{"key":27,"text":421,"correct":32},"提高土地利用率",{"key":30,"text":423,"correct":22},"户型设计",{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":24,"analysis":33},895379,"当初步设计较深，有详细的设备清单时，可采用的设备安装工程概算编制方法是()。",[428,430,432,434],{"key":20,"text":429,"correct":22},"扩大单价法",{"key":24,"text":431,"correct":32},"预算单价法",{"key":27,"text":433,"correct":22},"综合吨位指标法",{"key":30,"text":435,"correct":22},"安装设备百分比法",{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":24,"analysis":33},895380,"当初步设计有详细设备清单时，可按()编制单位设备安装工程概算。",[440,442,443,444],{"key":20,"text":441,"correct":22},"概算指标法",{"key":24,"text":431,"correct":32},{"key":27,"text":429,"correct":22},{"key":30,"text":435,"correct":22},{"id":446,"libraryId":5,"type":15,"typeLabel":16,"stem":447,"options":448,"answer":20,"analysis":33},895381,"当初步设计达到一定深度，建筑结构尺寸比较明确、能结合图纸计算工程量时，编制单位工程概算宜采用()。",[449,450,451,453],{"key":20,"text":429,"correct":32},{"key":24,"text":441,"correct":22},{"key":27,"text":452,"correct":22},"类似工程预算法",{"key":30,"text":454,"correct":22},"综合单价法",{"id":456,"libraryId":5,"type":15,"typeLabel":16,"stem":457,"options":458,"answer":20,"analysis":33},895382,"总平面设计是指总图运输设计和总平面配置，下列内容中均属于总平面设计中影响工程造价的主要因素的有()。",[459,461,463,465],{"key":20,"text":460,"correct":32},"现场条件、占地面积、功能分区",{"key":24,"text":462,"correct":22},"占地面积、功能分区、工艺流程",{"key":27,"text":464,"correct":22},"占地面积、运输方式、工艺流程",{"key":30,"text":466,"correct":22},"现场条件、运输方式、工艺流程",{"id":468,"libraryId":5,"type":15,"typeLabel":16,"stem":469,"options":470,"answer":27,"analysis":33},895383,"建筑结构的选择既要满足力学要求，又要考虑其经济性。对于多层房屋或大跨度结构的项目，应优先选用()。",[471,473,475,477],{"key":20,"text":472,"correct":22},"砌体结构",{"key":24,"text":474,"correct":22},"钢筋混凝土结构",{"key":27,"text":476,"correct":32},"钢结构",{"key":30,"text":478,"correct":22},"框架结构",{"id":480,"libraryId":5,"type":15,"typeLabel":16,"stem":481,"options":482,"answer":20,"analysis":33},895384,"初步设计达到一定深度，建筑结构尺寸比较明确，能按照初步设计的平面图、立面图、剖面图纸计算出楼地面、墙身、门窗和屋面等扩大分项工程（或扩大结构构件）项目的工程量时，此时比较适用的编制概算的方法是()。",[483,485,486,487],{"key":20,"text":484,"correct":32},"概算定额法",{"key":24,"text":441,"correct":22},{"key":27,"text":452,"correct":22},{"key":30,"text":433,"correct":22},{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":30,"analysis":33},895385,"常用于设备价格波动较大的非标准设备和引进设备的安装工程概算编制方法是()。",[492,493,494,496],{"key":20,"text":431,"correct":22},{"key":24,"text":429,"correct":22},{"key":27,"text":495,"correct":22},"设备价值百分比法",{"key":30,"text":433,"correct":32},{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":20,"analysis":33},895386,"工业建筑设计评价中，下列不同平面形状的建筑物，其建筑物周长与建筑面积比K周按从小到大顺序排列正确的是( )。",[501,503,505,507],{"key":20,"text":502,"correct":32},"正方形→矩形→T形→L形",{"key":24,"text":504,"correct":22},"矩形→正方形→T形→L形",{"key":27,"text":506,"correct":22},"T形→L形→正方形→矩形",{"key":30,"text":508,"correct":22},"L形→T形→矩形→正方形",{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":24,"analysis":33},895387,"在建设项目各阶段的工程造价中，一经批准将作为控制建设项目投资最高限额的是( )。",[513,515,517,519],{"key":20,"text":514,"correct":22},"投资估算",{"key":24,"text":516,"correct":32},"设计概算",{"key":27,"text":518,"correct":22},"施工图预算",{"key":30,"text":520,"correct":22},"竣工结算",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":20,"analysis":33},895389,"关于工业建设项目的建筑设计，下列不同于面形状的建筑物，其建筑物周长与建筑面积比 按从小到大顺序排列正确的是()。",[525,526,527,528],{"key":20,"text":502,"correct":32},{"key":24,"text":504,"correct":22},{"key":27,"text":506,"correct":22},{"key":30,"text":508,"correct":22},{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":30,"analysis":33},895390,"在用类似工程预算法编制工程概算时，需用价差公式对类似工程的成本单价进行调整，以下各项中不属于成本单价的是()。",[533,535,537,539],{"key":20,"text":534,"correct":22},"人工费",{"key":24,"text":536,"correct":22},"施工机具使用费",{"key":27,"text":538,"correct":22},"企业管理费",{"key":30,"text":540,"correct":32},"规费",{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":30,"analysis":33},895391,"设计概算的三级概算是指()。",[545,547,549,551],{"key":20,"text":546,"correct":22},"建筑工程概算、安装工程概算、设备及工器具购置费概算",{"key":24,"text":548,"correct":22},"建设投资概算、建设期利息概算、铺底流动资金概算",{"key":27,"text":550,"correct":22},"主要工程项目概算、辅助和服务性工程项目概算、室内外工程项目概算",{"key":30,"text":552,"correct":32},"单位工程概算、单项工程综合概算、建设项目总概算",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":27,"analysis":33},895392,"下列建筑设计影响工程造价的选项中，属于影响工业建筑但一般不影响民用建筑的因素是( )。",[557,559,561,563],{"key":20,"text":558,"correct":22},"建筑物平面形状",{"key":24,"text":560,"correct":22},"项目利益相关者",{"key":27,"text":562,"correct":32},"柱网布置",{"key":30,"text":564,"correct":22},"风险因素",{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":27,"analysis":33},895393,"关于多层民用住宅工程造价与其影响因素的关系，下列说法中正确的是( )。",[569,571,573,575],{"key":20,"text":570,"correct":22},"层数增加，单位造价增加",{"key":24,"text":572,"correct":22},"层高增加，单位造价降低",{"key":27,"text":574,"correct":32},"通常情况下建筑物周长系数越低，造价越低",{"key":30,"text":576,"correct":22},"宽度增加，单位造价上升",{"id":578,"libraryId":5,"type":15,"typeLabel":16,"stem":579,"options":580,"answer":20,"analysis":33},895394,"工业项目总面积设计中，影响工程造价的主要因素包括()。",[581,583,585,587],{"key":20,"text":582,"correct":32},"现场条件、占地面积、功能分区、运输方式",{"key":24,"text":584,"correct":22},"现场条件、产品方案、运输方式、柱网布置",{"key":27,"text":586,"correct":22},"占地面积、功能分区、空间组合、建筑材料",{"key":30,"text":588,"correct":22},"功能分区、空间组合、设备选型、厂址方案",{"id":590,"libraryId":5,"type":15,"typeLabel":16,"stem":591,"options":592,"answer":27,"analysis":33},895395,"下列不属于影响民用住宅建筑设计中影响工程造价的主要因素的是()。",[593,595,597,599],{"key":20,"text":594,"correct":22},"建筑物平面形状和周长系数",{"key":24,"text":596,"correct":22},"住宅的层高和净高",{"key":27,"text":598,"correct":32},"建筑物的体积与面积",{"key":30,"text":600,"correct":22},"住宅建筑结构的选择",[602,605,608,611,614,617],{"id":15,"name":603,"category":7,"favorite":604},"领导干部任职前廉政法规知识测试题",92,{"id":606,"name":607,"category":7,"favorite":15},595,"建筑结构与设备",{"id":609,"name":610,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":612,"name":613,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":615,"name":616,"category":7,"favorite":8},534,"BIM工程师",{"id":618,"name":616,"category":7,"favorite":8},535]