[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-897765":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},897765,581,2,"多选题","关于工程项目后评价的说法，正确的有（）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","项目后评价应在竣工验收阶段进行",false,{"key":16,"text":17,"correct":18},"B","项目后评价的基本方法是对比法",true,{"key":20,"text":21,"correct":14},"C","项目效益后评价仅包含经济效益后评价和项目综合效益后评价",{"key":23,"text":24,"correct":18},"D","过程后评价是项目后评价的重要内容",{"key":26,"text":27,"correct":18},"E","项目后评价是工程项目实施阶段管理的延伸","BDE","项目后评价的基本方法是对比法；项目效益后评价包括经济效益后评价、环境效益和社会效益后评价、项目可持续性后评价及项目综合效益后评价。",{"id":6,"name":31,"category":32,"favorite":33},"建设工程造价管理基础知识","建筑工程",0]