[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-897473":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},897473,581,2,"多选题","在分部分项工程量清单编制计算工程量时，应依据的计算原则包括()。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","计算口径一致",true,{"key":16,"text":17,"correct":14},"B","按工程量计算规则计算",{"key":19,"text":20,"correct":14},"C","按图纸计算",{"key":22,"text":23,"correct":14},"D","按一定顺序计算",{"key":25,"text":26,"correct":27},"E","根据工程内容和定额项目计算",false,"ABCD","本题考查的是招标工程量清单的编制。分部分项工程量清单编制中，必须依据的一定的计算原则及方法：(1)计算口径一致；(2)按工程量计算规则计算；(3)按图纸计算；(4)按一定顺序计算。",{"id":6,"name":31,"category":32,"favorite":33},"建设工程造价管理基础知识","建筑工程",0]