[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-896867":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},896867,581,1,"单选题","新增固定资产价值的计算对象是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","独立专业的单位工程",false,{"key":16,"text":17,"correct":14},"B","独立施工的单位工程",{"key":19,"text":20,"correct":21},"C","独立发挥生产能力的单项工程",true,{"key":23,"text":24,"correct":14},"D","独立设计的单位工程","新增固定资产价值的计算是以独立发挥生产能力的单项工程为对象的。单项工程建成经有关部门验收鉴定合格，正式移交生产或使用，即应计算新增固定资产价值。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理基础知识","建筑工程",0]