[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-896865":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},896865,581,1,"单选题","基本建设项目竣工决算报表不包括（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","建设项目概况表",false,{"key":16,"text":17,"correct":18},"B","资金平衡表",true,{"key":20,"text":21,"correct":14},"C","基本建设项目竣工财务决算表",{"key":23,"text":24,"correct":14},"D","基本建设项目交付使用资产明细表","建设项目竣工决算报表包括：基本建设项目概况表，基本建设项目竣工财务决算表，基本建设项目资金使用情况明细表，基本建设项目交付使用资产总表，基本建设项目交付使用资产明细表，待摊投资明细表，待核销基建支出明细表，转出投资明细表等。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理基础知识","建筑工程",0]