[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-896854":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},896854,581,1,"单选题","下列属于本周期合计应扣减的金额的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","本周期已完成单价项目的金额",false,{"key":16,"text":17,"correct":14},"B","周期应支付的总价项目的金额",{"key":19,"text":20,"correct":14},"C","本周期已完成的计日工价款",{"key":22,"text":23,"correct":24},"D","本周期应扣回的预付款",true,"本周期合计应扣减的金额，其中包括：①本周期应扣回的预付款；②本周期应扣减的金额。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理基础知识","建筑工程",0]