[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-896826":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},896826,581,1,"单选题","投标人在投标报价时，应优先被采用为综合单价编制依据的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","企业定额",true,{"key":16,"text":17,"correct":18},"B","地区定额",false,{"key":20,"text":21,"correct":18},"C","行业定额",{"key":23,"text":24,"correct":18},"D","国家定额","本题考查的是投标报价编制。投标人在投标报价时，应优先被采用为综合单价编制依据的是企业定额。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理基础知识","建筑工程",0]