[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-896819":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},896819,581,1,"单选题","招标人要求总承包人对专业工程进行统一管理和协调的，总承包人可计取总承包服务费，其取费基数为（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","专业工程估算造价",true,{"key":16,"text":17,"correct":18},"B","投标报价总额",false,{"key":20,"text":21,"correct":18},"C","分部分项工程费用",{"key":23,"text":24,"correct":18},"D","分部分项工程费与措施费之和","本题考查的是最高投标限价的编制。招标人要求总承包人对专业工程进行统一管理和协调的，总承包人可计取总承包服务费，其取费基数为专业工程估算造价。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理基础知识","建筑工程",0]