[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-896800":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},896800,581,1,"单选题","工程量清单是招标文件的组成部分，工程量清单的组成不包括（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","分部分项工程工程量清单",false,{"key":16,"text":17,"correct":14},"B","措施项目清单",{"key":19,"text":20,"correct":14},"C","其他项目清单",{"key":22,"text":23,"correct":24},"D","直接工程费用清单",true,"工程量清单作为招标文件的组成部分，主要由分部分项工程量清单、措施项目清 单、其他项目清单、规费和增值税项目清单组成。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理基础知识","建筑工程",0]