[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-896759":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},896759,581,1,"单选题","实物量法编制施工图预算时采用的人工、 材料、 机械的单价应为( )。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","项目所在地定额基价中的价格",false,{"key":16,"text":17,"correct":14},"B","预测的项目建设期的市场价格",{"key":19,"text":20,"correct":21},"C","当时当地的实际价格",true,{"key":23,"text":24,"correct":14},"D","定额编制时的市场价格","",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理基础知识","建筑工程",0]