[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-896694":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},896694,581,1,"单选题","详细的可行性研究阶段投资估算的要求为误差控制在±（）%以内。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","5",false,{"key":16,"text":17,"correct":18},"B","10",true,{"key":20,"text":21,"correct":14},"C","15",{"key":23,"text":24,"correct":14},"D","20","投资决策是一个由浅入深、不断深化的过程，不同阶段决策的深度不同，投资估算的精度也不同。如在投资机会和项目建议书阶段，投资估算的误差率在±30%左右；而在详细可行性研究阶段，误差率在±10%以内。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理基础知识","建筑工程",0]