[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-896685":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},896685,581,1,"单选题","工业项目总平面设计中，影响工程造价的主要因素包括（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","占地面积、功能分区、运输方式",true,{"key":16,"text":17,"correct":18},"B","产品方案、运输方式、柱网布置",false,{"key":20,"text":21,"correct":18},"C","占地面积、空间组合、建筑材料",{"key":23,"text":24,"correct":18},"D","功能分区、空间组合、设备选型","工业项目总平面设计中影响工程造价的因素有占地面积、功能分区和运输方式的选择。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理基础知识","建筑工程",0]