[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-896684":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},896684,581,1,"单选题","在建设项目设计阶段，对于极特殊的、复杂的方案比选一般采用（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","投资回收期法",false,{"key":16,"text":17,"correct":14},"B","内部收益率法",{"key":19,"text":20,"correct":14},"C","净现值法",{"key":22,"text":23,"correct":24},"D","综合财务评价法",true,"在建设项目设计阶段，多方案比选多属于局部方案比选，对于技术上先进、适用的设计方案，进行经济评价、比选时，可以采用造价额度、运行费用、净现值、净年值等方法，极特殊的、复杂的方案比选采用综合财务评价方法。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理基础知识","建筑工程",0]