[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-896652":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},896652,581,1,"单选题","编制人工定额时，基本工作结束后整理劳动工具时间应计入（）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","休息时间",false,{"key":16,"text":17,"correct":14},"B","不可避免的中断时间",{"key":19,"text":20,"correct":21},"C","有效工作时间",true,{"key":23,"text":24,"correct":14},"D","损失时间","基本工作结束后的整理工作属于准备与于结束工作时间，是有效工作时间。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理基础知识","建筑工程",0]