[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-896644":3},{"question":4,"library":25},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":20},896644,581,1,"单选题","确定施工机械台班定额消耗量前需计算机械时间利用系数，其计算公式正确的是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","机械时间利用系数=机械纯工作1h正常生产率×工作班纯工作时间",false,{"key":16,"text":17,"correct":14},"B","机械时间利用系数=1\u002F机械台班产量定额",{"key":19,"text":20,"correct":21},"C","机械时间利用系数=机械在一个工作班内纯工作时间\u002F一个工作班延续时间（8h）",true,{"key":23,"text":24,"correct":14},"D","机械时间利用系数=一个工作班延续时间（8h）\u002F机械在一个工作班内纯工作时间",{"id":6,"name":26,"category":27,"favorite":28},"建设工程造价管理基础知识","建筑工程",0]