[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-896525":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},896525,581,1,"单选题","按成本计算估价法，非标准设备的原价的组成不包括（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","材料费",false,{"key":16,"text":17,"correct":14},"B","专用工具费",{"key":19,"text":20,"correct":14},"C","外购配套件费",{"key":22,"text":23,"correct":24},"D","临时设施费",true,"按成本计算估价法，非标准设备的原价由以下各项组成：1)材料费 。2)加工费。3)辅助材料费。4)专用工具费。5)废品损失费。6)外购配套件费。7)包装费 。8)利润 。9)非标准设备设计费。10)增值税 。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理基础知识","建筑工程",0]