[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-896449":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},896449,581,1,"单选题","PMC模式下， 项目管理承包商在项目前期阶段工作内容是指（） 。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","进行设计管理，协调有关技术条件",false,{"key":16,"text":17,"correct":14},"B","完成项目总体中某些部分的详细设计",{"key":19,"text":20,"correct":21},"C","组织项目风险识别和分析，并制定项目风险应对策略",true,{"key":23,"text":24,"correct":14},"D","实施采购管理，并为业主负责的采购提供服务","",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理基础知识","建筑工程",0]