[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-896419":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},896419,581,1,"单选题","根据《国务院关于投资体制改革的决定》，对于采用投资补助、转贷和贷款贴息方式的政府投资项目，政府投资主管部门需要审批（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","初步设计概算",false,{"key":16,"text":17,"correct":14},"B","项目申请报告",{"key":19,"text":20,"correct":21},"C","资金申请报告",true,{"key":23,"text":24,"correct":14},"D","项目开工报告","本题考查的是工程项目管理概述。采用投资补助、转贷和贷款贴息方式的，则只审批资金申请报告。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理基础知识","建筑工程",0]