[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-896391":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},896391,581,1,"单选题","过程后评价是指对工程项目立项决策、设计施工、竣工投产、生产运营等全过程进行系统分析，找出项目后评价与（）之间的差异及其产生原因，使后评价结论有根有据，同时针对问题提出解决办法。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","投资总额",false,{"key":16,"text":17,"correct":18},"B","原预期效益",true,{"key":20,"text":21,"correct":14},"C","实际收益",{"key":23,"text":24,"correct":14},"D","效益后评价","过程后评价是指对工程项目立项决策、设计施工、竣工投产、生产运营等全过程进行系统分析，找出项目后评价与原预期效益之间的差异及其产生原因，使后评价结论有根有据，同时针对问题提出解决办法。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理基础知识","建筑工程",0]