[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-896389":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},896389,581,1,"单选题","工程设计工作一般划分为两个阶段，即（）和施工图设计。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","规划设计",false,{"key":16,"text":17,"correct":14},"B","技术设计",{"key":19,"text":20,"correct":21},"C","初步设计",true,{"key":23,"text":24,"correct":14},"D","工艺设计","工程设计工作一般划分为两个阶段，即初步设计和施工图设计。重大项目和技术复杂项目，可根据需要增加技术设计阶段。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理基础知识","建筑工程",0]