[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-896285":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},896285,581,1,"单选题","下列属于应当承担缔约过失责任的情形是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","施工单位没有按照合同约定的时间完成工程",false,{"key":16,"text":17,"correct":14},"B","建设单位没有按照合同约定的时间支付工程款",{"key":19,"text":20,"correct":14},"C","施工单位在投标时借用了其他企业的资质，在资格预审时没有通过审查",{"key":22,"text":23,"correct":24},"D","建设单位在发出中标通知书后，改变了中标人",true,"本题考查的是缔约过失责任。选项AB属于违约责任。选项C未造成损失。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理基础知识","建筑工程",0]