[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-896230":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},896230,581,1,"单选题","工程设计的修改由（ ）负责。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","建筑施工企业",false,{"key":16,"text":17,"correct":14},"B","建设单位",{"key":19,"text":20,"correct":21},"C","原设计单位",true,{"key":23,"text":24,"correct":14},"D","勘察单位","工程设计的修改由原设计单位负责，建筑施工企业不得擅自修改工程设计。建筑施工企业必须按照工程设计要求、施工技术标准和合同的约定，对建筑材料、构配件和设备进行检验，不合格的不得使用。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理基础知识","建筑工程",0]