[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-896200":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},896200,581,1,"单选题","某施工项目招标， 招标文件开始出售的时间为3月20日， 停止出售的时间为3月30日， 提交投标文件的截止时间为4月25日， 评标结束的时间为4月30日， 则投标有效期开始的时间为（ ）",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","3月20日",false,{"key":16,"text":17,"correct":14},"B","3月30日",{"key":19,"text":20,"correct":21},"C","4月25日",true,{"key":23,"text":24,"correct":14},"D","4月30日","",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理基础知识","建筑工程",0]