[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-896164":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},896164,581,1,"单选题","某工程采用单价合同，施工过程中承包人向发包人提交了已完工程量报告，发包人决定进行工程计量，下列计量结果有效的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","A．发包人在计量前24 小时通知承包人，但计量时承包人没有在场",true,{"key":16,"text":17,"correct":18},"B","B．发包人在没有通知承包人的情况下到现场计量",false,{"key":20,"text":21,"correct":18},"C","发包人没有在预定的时间去现场计量，而是在方便的时候进行计量",{"key":23,"text":24,"correct":18},"D","发包人单独对承包人返工重做的分项工程计量","本题考查的是单价合同的计量。发包人认为需要进行现场计量核实时，应在计量前24 小时通知承包人。承包人收到通知后不派人参加计量，视为认可发包人的计量核实结果。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理基础知识","建筑工程",0]