[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-896128":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},896128,581,1,"单选题","关于施工过程中材料费控制的说法，正确的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","有消耗定额的材料采用限额发料",true,{"key":16,"text":17,"correct":18},"B","没有消耗定额的材料必须包干使用",false,{"key":20,"text":21,"correct":18},"C","零星材料应实施计划管理并按指标控制",{"key":23,"text":24,"correct":18},"D","有消耗定额的材料均不得超过领料限额","考点:施工成本的过程控制方法。对于有消耗定额的材料，以消耗定额为依据，实行限额发料制度。参见教材P117。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理基础知识","建筑工程",0]