[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-895695":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},895695,581,1,"单选题","关于竣工结算的编制与审查的说法中，错误的是()。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","单位工程竣工结算由承包人编制",false,{"key":16,"text":17,"correct":14},"B","建设项目竣工总结算经发承包人签字盖章后有效",{"key":19,"text":20,"correct":14},"C","竣工结算的编制依据包括经批准的开、竣工报告或停、复工报告",{"key":22,"text":23,"correct":24},"D","结算中的暂列金额应减去工程价款调整与索赔、现场签证金额，若有余款归承包人",true,"在竣工结算编制过程中，其他项目应按下列规定计价： (1)计日工应按发包人实际签证确认的事项计算； (2)暂估价应按发承包双方按照《建设工程工程量清单计价规范》GB50500-2013的相关规定计算； (3)总承包服务费应依据合同约定金额计算，如发生调整的，以发承包双方确认调整的金额计算； (4)施工索赔费用应依据发承包双方确认的索赔事项和金额计算； (5)现场签证费用应依据发承包双方签证资料确认的金额计算； (6)暂列金额应减去工程价款调整（包括索赔、现场签证）金额计算，如有余额归发包人。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理基础知识","建筑工程",0]