[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-895613":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},895613,581,1,"单选题","最终结清是指合同约定的缺陷责任期终止后，承包人已按合同规定完成全部剩余工作且质量合格的，发包人与承包人结清全部剩余款项的活动，以下说法错误的是()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","缺陷责任期终止后，承包人已按合同规定完成全部剩余工作且质量合格的，发包人签发缺陷责任期终止证书",false,{"key":16,"text":17,"correct":18},"B","缺陷责任期终止后，承包人在合同内享有的索赔权利也自行终止",true,{"key":20,"text":21,"correct":14},"C","发包人收到承包人提交的最终结清申请单后的14天内予以核实，向承包人签发最终支付证书",{"key":23,"text":24,"correct":14},"D","发包人应在签发最终结清支付证书后的14天内，按照最终结清支付证书列明的金额向承包人支付最终结清款","最终结清付款后，承包人在合同内享有的索赔权利也自行终止。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理基础知识","建筑工程",0]