[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-895536":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},895536,581,1,"单选题","关于投标报价时综合单价的确定，下列做法中正确的是（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","以项目特征描述为依据确定综合单价",true,{"key":16,"text":17,"correct":18},"B","招标工程量清单特征描述与设计图纸不符时，应以设计图纸为准",false,{"key":20,"text":21,"correct":18},"C","应考虑招标文件规定范围（幅度）外的风险费用",{"key":23,"text":24,"correct":18},"D","消耗量指标的计算应以地区或行业定额为依据","项目特征是确定综合单价的重要依据之一，投标人投标报价时应依据招标文件中清单项目的特征描述确定综合单价。在招标投标过程中，当出现招标工程量清单特征描述与设计图纸不符时，投标人应以招标工程量清单的项目特征描述为准，确定投标报价的综合单价。当施工中施工图纸或设计变更与招标工程量清单项目特征描述不一致时，发承包双方应按实际施工的项目特征，依据合同约定重新确定综合单价。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理基础知识","建筑工程",0]