[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-895522":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},895522,581,1,"单选题","根据《建设工程工程量清单计价规范》GB50500-2013，允许投标人根据具体情况对招标工程量清单进行修正或增加的内容是()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","分部分项工程量清单",false,{"key":16,"text":17,"correct":18},"B","措施项目清单",true,{"key":20,"text":21,"correct":14},"C","暂列金额",{"key":23,"text":24,"correct":14},"D","计日工","本题考查的是投标报价的编制方法和内容。投标人对措施项目中的总价项目投标报价应遵循以下原则：(1)措施项目应依据招标人提供的措施项目清单和投标人投标时拟定的施工组织设计或施工方确定；(2)措施项目费由投标人自主确定，但其中安全文明施工费必须按照国家或省级、行业建设主管部门的规定计价，不得作为竞争性费用。招标人不得要求投标人对该项费用进行优惠，投标人也不得将该项费用参与市场竞争。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理基础知识","建筑工程",0]