[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-895510":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},895510,581,1,"单选题","关于招标控制价及其编制的说法，正确的是（）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","综合单价中包括应由招标人承担的风险费用",false,{"key":16,"text":17,"correct":14},"B","招标人供应的材料，总承包服务费应按材料价值的1.5%计算",{"key":19,"text":20,"correct":21},"C","措施项目费应按招标文件中提供的措施项目清单确定",true,{"key":23,"text":24,"correct":14},"D","招标文件提供暂估价的主要材料，其主材费用应计入其他项目清单费用","招标文件提供了暂估单价的材料，应按暂估的单价计入综合单价；综合单价中应包括招标文件中要求招标人承担的风险内容及其范围产生的风险费用。措施项目应按招标文件中提供的措施项目清单确定。招标人自行供应材料的，总承包服务费按招标人供应材料价值的1%计算。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理基础知识","建筑工程",0]