[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-895500":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},895500,581,1,"单选题","在编制措施项目清单时，关于钢筋混凝土模版及支架费项目，应在清单中列明（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","项目编码",true,{"key":16,"text":17,"correct":18},"B","计算基础",false,{"key":20,"text":21,"correct":18},"C","取费费率",{"key":23,"text":24,"correct":18},"D","工作内容","措施项目应按招标文件中提供的措施项目清单确定，措施项目采用分部分项工程综合单价形式进行计价的工程量，应按措施项目清单中的工程量，并按与分部分项工程工程量清单单价相同的方式确定综合单价；以“项”为单位的方式计价的，依有关规定按综合价格计算，包括除规费、税金以外的全部费用。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理基础知识","建筑工程",0]