[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-895494":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},895494,581,1,"单选题","招标工程量清单应根据常规施工方案编制，拟定常规施工方案时（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","应对主要项目进行估算，如土石方、混凝土",true,{"key":16,"text":17,"correct":18},"B","需对施工总方案中的重大问题及关键工艺作明确具体的规定",false,{"key":20,"text":21,"correct":18},"C","不需计算人、材、机资源消耗量",{"key":23,"text":24,"correct":18},"D","不需考虑节假日与气候对工期的影响","在拟定常规的施工组织设计时需注意以下问题：1）估算整体工程量，根据概算指标或类似工程进行估算，且仅对主要项目加以估算即可，如土石方、混凝土等；2）拟定施工总方案，施工总方案只需对重大问题和关键工艺作原则性的规定，不需考虑施工步骤。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理基础知识","建筑工程",0]