[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-895493":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},895493,581,1,"单选题","关于招标工程量清单中其他项目清单的编制，下列说法中正确的是（）",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","投标人情况、发包人对工程管理要求对其内容会有直接影响",false,{"key":16,"text":17,"correct":18},"B","暂列金额可以只列总额，但不同专业预留的暂列金额应分别列项",true,{"key":20,"text":21,"correct":14},"C","专业工程暂估价应包括利润、规费和税金",{"key":23,"text":24,"correct":14},"D","计日工的暂定数量可以由投标人填写","(1)暂列金额是指招标人暂定并包括在合同中的一笔款项。用于工程合同签订时尚未确定或者不可预见的所需材料、工程设备、服务的采购，施工中可能发生的工程变更、合同约定调整因素出现时的合同价款调整以及发生的索赔、现场签证确认等的费用。此项费用由招标人填写其项目名称、计量单位、暂定金额等，若不能详列，也可只列暂定金额总额",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理基础知识","建筑工程",0]