[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-895490":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},895490,581,1,"单选题","编制钢筋工程量清单时，适宜采用暂估量加签证处理的钢筋是()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","支撑双层钢筋用的“铁马”",true,{"key":16,"text":17,"correct":18},"B","伸出构件的锚固钢筋",false,{"key":20,"text":21,"correct":18},"C","设计注明的搭接钢筋",{"key":23,"text":24,"correct":18},"D","规范规定的搭接钢筋","本题考查的是招标工程量清单的编制。 ①现浇构件中伸出构件的锚固钢筋应并入钢筋工程量内。除设计（包括规范规定）标明的搭接外，其他施工搭接不计算工程量，在综合单价中综合考虑。②现浇构件中固定位置的支撑钢筋、双层钢筋用的‘铁马’在编制工程量清单时，如果设计未明确，其工程数量可为暂估量，结算时按现场签证数量计算。”",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理基础知识","建筑工程",0]