[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-895475":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},895475,581,1,"单选题","根据《建设工程工程量清单计价规范》GB 50500-2013，在招标文件未另有要求的情况下，投标报价的综合单价一般要考虑的风险因素是（）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","政策法规的变化",false,{"key":16,"text":17,"correct":14},"B","人工单价的市场变化",{"key":19,"text":20,"correct":14},"C","政府定价材料的价格变化",{"key":22,"text":23,"correct":24},"D","管理费、利润的风险",true,"对于承包人根据自身技术水平、管理、经营状况能够自主控制的风险.， 如承包人的管理费、利润的风险，承包人应结合市场情况，根据企业自身的实际合理确定、自主报价，该部分风险由承包人全部承担",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理基础知识","建筑工程",0]