[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-895471":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},895471,581,1,"单选题","如果修改招标文件的时间距投标截止时间不足( )天，相应推后投标截止时间。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","7",false,{"key":16,"text":17,"correct":14},"B","14",{"key":19,"text":20,"correct":21},"C","15",true,{"key":23,"text":24,"correct":14},"D","20","本题考查的是招标文件的组成内容及其编制要求。如果修改招标文件的时间距投标截止时间不足15天，相应推后投标截止时间。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理基础知识","建筑工程",0]