[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-895304":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},895304,581,1,"单选题","投资估算的编制方法中，以拟建项目的主体工程费为基数，以其他工程费与主体工程费的百分比为系数，估算拟建项目静态投资的方法是()。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","单位生产能力估算法",false,{"key":16,"text":17,"correct":14},"B","生产能力指数法",{"key":19,"text":20,"correct":21},"C","系数估算法",true,{"key":23,"text":24,"correct":14},"D","比例估算法","系数估算法也称为因子估算法，它是以拟建项目的主体工程费或主要设备购置费为基数，以其他工程费与主体工程费或设备购置费的百分比为系数，依此估算拟建项目静态投资的方法。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理基础知识","建筑工程",0]