[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-895209":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},895209,581,1,"单选题","根据计时观察资料得知：每㎡标准砖墙勾缝时间为10min，辅助工作时间占工序作业时间的比例为5%，准备结束时间、不可避免中断时间、休息时间占工作班时间的比例分别为3%、2%、15%。则每立方米砌体标准砖厚砖墙勾缝的产量定额为（）3／工日。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","8.621",false,{"key":16,"text":17,"correct":18},"B","8.772",true,{"key":20,"text":21,"correct":14},"C","9.174",{"key":23,"text":24,"correct":14},"D","14.493","1 砖厚的砖墙，其每立方米砌体墙面面积的换算系数为=4.17 ㎡ 则每立方米砖墙的勾缝时间为41.7min 工序作业时间=41.7\u002F（1-5%）=43.895min 定额时间=43.895\u002F（1-3%-2%-15%）=54.868min=54.868\u002F60\u002F8=0.114 工日 则产量定额=1\u002F0.114=8.772",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理基础知识","建筑工程",0]