[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-895205":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},895205,581,1,"单选题","在机械工作时间消耗的分类中，由于工人装料数量不足引起的汽车在降低复核的情况下工作所延续的时间属于（）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","有根据地降低负荷下的工作时间",false,{"key":16,"text":17,"correct":14},"B","机械的多余工作时间",{"key":19,"text":20,"correct":14},"C","违反劳动纪律引起的机械时间损失",{"key":22,"text":23,"correct":24},"D","低负荷下的工作时间",true,"低负荷下的工作时间，是由于工人或技术人员的过错所造成的施工机械在降低负荷的情况下工作的时间。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理基础知识","建筑工程",0]