[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-895203":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},895203,581,1,"单选题","施工过程可以分为工序、工作过程和综合工作工程，其分类标准是（）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","工艺特点",false,{"key":16,"text":17,"correct":14},"B","工具设备的机械化程度",{"key":19,"text":20,"correct":21},"C","组织复杂程度",true,{"key":23,"text":24,"correct":14},"D","施工过程性质","施工过程的分类可以按照组织上的复杂程度，分解为工序、工作过程和综合工作过程;按照工艺特点，施工过程可以分为循环施工过程和非循环施工过程两类。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理基础知识","建筑工程",0]