[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-895160":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},895160,581,1,"单选题","在计算预算定额人工工日消耗量时，包含在人工幅度差内的用工是（）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","超运距用工",false,{"key":16,"text":17,"correct":14},"B","材料加工用工",{"key":19,"text":20,"correct":14},"C","机械土方工程的配合用工",{"key":22,"text":23,"correct":24},"D","工种交叉作业相互影响的停歇用工",true,"人工幅度差内容包括： ①各工种间的工序搭接及交叉作业相互配合或影响所发生的停歇用工； ②施工过程中，移动临时水电线路而造成的影响工人操作的时间； ③工程质量检查和隐蔽工程验收工作而影响工人操作的时间； ④同一现场内单位工程之间因操作地点转移而影响工人操作的时间； ⑤工序交接时对前一工序不可避免的修整用工。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理基础知识","建筑工程",0]