[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-895130":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},895130,581,1,"单选题","若投标人对某个工程量清单项目的单价和合价未予填报，则（）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","招标人应及时通知投标人补充填报",false,{"key":16,"text":17,"correct":14},"B","表明投标人不负责该项任务",{"key":19,"text":20,"correct":14},"C","表明投标人认为该分项工程数量有误，需调整后再报价",{"key":22,"text":23,"correct":24},"D","视此项费用已在其他单价和合价中考虑",true,"这题考核工程量清单计价格式，其中列明的所有需要填报的单价和合价，投标人均应填报，未填报的单价和合价，视为此项费用已包含在工程量清单的其他单价和合价中。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理基础知识","建筑工程",0]