[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-895121":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},895121,581,1,"单选题","下列关于工程量清单计价的说法不正确的是（）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","招标工程量清单应由具有编制能力的招标人或受其委托，具有相应资质的工程造价咨询人或招标代理人编制",false,{"key":16,"text":17,"correct":14},"B","采用工程量清单方式招标，招标工程量清单必须作为招标文件的组成部分",{"key":19,"text":20,"correct":21},"C","招标工程量清单的准确性和完整性由投标人负责",true,{"key":23,"text":24,"correct":14},"D","招标工程量清单应以单位（项）工程为单位编制","釆用工程量清单方式招标，招标工程量清单必须作为招标文件的组成部分，其准确性和完整性由招标人负责。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理基础知识","建筑工程",0]