[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-895072":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},895072,581,1,"单选题","在编制工程概预算时，下列说法正确的是（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","工程概预算的形成过程就是依据工程定额、预算价格和取费标准，经过不同层次的计算形成相应造价的过程",true,{"key":16,"text":17,"correct":18},"B","工程概预算编制的基本构造要素包括人工、材料和施工机械",false,{"key":20,"text":21,"correct":18},"C","工程量计算书是根据施工图编制的",{"key":23,"text":24,"correct":18},"D","投资估算指标是确定工程单价的依据","工程概预算的编制是国家通过颁布统一的计价定额或指标，对建筑产品价格进行计价的活动。国家以假定的建筑安装产品为对象,制定统一的预算和概算定额。然后按概预算定额规定的分部分项子目，逐项计算工程量，套用概预算定额单价（或单位估价表）确定直接工程费，然后按规定的取费标准确定措施费、间接费、利 润和税金，经汇总后即为工程概、预算价值。计算工程量的依据包括初步设计和施工图，确定工程单价的依据包括工程定额和预算价格，其中工程定额包括概算指标、概算定额、预算定额和补充定额。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理基础知识","建筑工程",0]