[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-895001":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},895001,581,1,"单选题","下列关于费用计算的说法，不正确的是（）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","应予计量的措施项目：措施项目费=Σ（措施项目工程量×综合单价）",false,{"key":16,"text":17,"correct":14},"B","不宜计量的措施项目：安全文明施工费=计算基数×安全文明施工费费率（％）",{"key":19,"text":20,"correct":14},"C","其余不宜计量的措施项目：措施项目费=计算基数×措施项目费费率（％）",{"key":22,"text":23,"correct":24},"D","分部分项工程费=Σ[分部分项工程量×费率（％）]",true,"分部分项工程费是指各专业工程的分部分项应予列支的各项费用。^分部分项工程费=Σ(分部分项工程量×综合单价）",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理基础知识","建筑工程",0]