[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-894957":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},894957,581,1,"单选题","在建设项目总投资中，为完成工程项目建设，在建设期内投入且形成现金流出的全部费用是（）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","工程造价",false,{"key":16,"text":17,"correct":14},"B","建设项目总投资",{"key":19,"text":20,"correct":21},"C","建设投资",true,{"key":23,"text":24,"correct":14},"D","工程费用","工程造价中的主要构成部分是建设投资，建设投资是为完成工程项目建设，在建设期内投入且形成现金流出的全部费用",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理基础知识","建筑工程",0]