[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-894904":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},894904,581,1,"单选题","城镇市政基础设施工程的建设单位应在开工前向()申请领取施工许可证。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","国务院建设主管部门",false,{"key":16,"text":17,"correct":14},"B","工程所在地省级以上人民政府建设主管部门",{"key":19,"text":20,"correct":14},"C","工程所在地地市级以上人民政府建设主管部门",{"key":22,"text":23,"correct":24},"D","工程所在地县级以上人民政府建设主管部门",true,"从事各类房屋建筑及其附属设施的建造、装修装饰和与其配套的线路、管道、设备的安装，以及城镇市政基础设施工程的施工，业主在开工前应当向工程所在地的县级以上人民政府建设行政主管部门申请领取施工许可证。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理基础知识","建筑工程",0]