[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-894865":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},894865,581,1,"单选题","概算造价是指在采用三阶段设计的（）阶段确定工程造价的文件。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","项目建议书",false,{"key":16,"text":17,"correct":18},"B","初步设计",true,{"key":20,"text":21,"correct":14},"C","技术设计",{"key":23,"text":24,"correct":14},"D","施工图设计","修正概算造价是指在技术设计阶段，根据技术设计的要求，通过编制修正概算文件，预先测算和确定的工程造价。修正概算是对初步设计阶段的概算造价的修正和调整，比概算造价准确,但受概算造价控制。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理基础知识","建筑工程",0]