[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-894821":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},894821,581,1,"单选题","根据《招标投标法实施条例》的规定，下列关于资格预审的说法错误的是（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","潜在投标人对资格预审文件有异议的，应当在提交资格预审申请文件截止时间2 日前提出",false,{"key":16,"text":17,"correct":18},"B","潜在投标人对资格预审文件有异议的，应当在提交资格预审申请文件截止时间5 日前提出",true,{"key":20,"text":21,"correct":14},"C","招标人应当自收到异议之日起3 日内作出答复",{"key":23,"text":24,"correct":14},"D","作出答复前，应当暂停招标投标活动","如潜在投标人或者其他利害关系人对资格预审文件有异议，应当在提交资格预审申请文件截止时间2日前提出；如对招标文件有异议,应当在投标截止时间10 日前提出。招标人应当自收到异议之日起3 日作出答复;作出答复前，应当暂停招标投标活动。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理基础知识","建筑工程",0]