[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-580-9":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":608},{"id":5,"name":6,"category":7,"favorite":8},580,"[土木建筑工程]建设工程计量与计价实务","建筑工程",0,9,50,1733,[13,34,46,58,70,82,94,106,115,127,139,151,163,175,187,199,211,223,235,247,259,270,281,293,302,314,326,338,350,362,374,386,398,406,418,430,442,454,466,478,490,502,514,526,536,548,560,572,584,596],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},893376,1,"单选题","用推土机回填管沟，当无倒车余地时一般采用（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","沟槽推土法",false,{"key":24,"text":25,"correct":26},"B","斜角推土法",true,{"key":28,"text":29,"correct":22},"C","下坡推土法",{"key":31,"text":32,"correct":22},"D","分批集中，一次推土法","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},893377,"反铲挖土机的挖土特点是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"前进向上，强制切土",{"key":24,"text":41,"correct":26},"后退向下，强制切土",{"key":28,"text":43,"correct":22},"后退向下，自重切土",{"key":31,"text":45,"correct":22},"直上直下，自重切土",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},893378,"为了提高铲运机铲土效率，适宜采用的铲运方法为（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"上坡铲土",{"key":24,"text":53,"correct":22},"并列铲土",{"key":28,"text":55,"correct":22},"斜向铲土",{"key":31,"text":57,"correct":26},"间隔铲土",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},893379,"关于推土机施工作业，说法正确的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"土质较软使切土深度较大时可采用分批集中后一次推送",{"key":24,"text":65,"correct":26},"并列推土的推土机数量不宜超过4台",{"key":28,"text":67,"correct":22},"沟槽推土法是先用小型推土机推出两侧沟槽后再用大型推土机推土",{"key":31,"text":69,"correct":22},"斜角推土法是指推土机行走路线沿斜向交叉推进",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},893380,"相对其他施工方法，板柱框架结构的楼板采用升板法施工的优点是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"节约模板，造价较低",{"key":24,"text":77,"correct":22},"机械化程度高，造价较低",{"key":28,"text":79,"correct":22},"用钢量小，造价较低",{"key":31,"text":81,"correct":26},"不用大型机械，适宜狭地施工",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":28,"analysis":33},893381,"采用推土机并列推土时，并列台数不宜超过（ ）台。",[86,88,90,92],{"key":20,"text":87,"correct":22},"2",{"key":24,"text":89,"correct":22},"3",{"key":28,"text":91,"correct":26},"4",{"key":31,"text":93,"correct":22},"5",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},893382,"在开挖深3m，Ⅰ～Ⅲ级砂土基坑，且地下水位较高时，宜优先选用（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"正铲挖掘机",{"key":24,"text":101,"correct":26},"反铲挖掘机",{"key":28,"text":103,"correct":22},"拉铲挖掘机",{"key":31,"text":105,"correct":22},"抓铲挖掘机",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},893383,"正铲挖掘机的挖土特点是（ ）。",[110,111,112,114],{"key":20,"text":39,"correct":26},{"key":24,"text":43,"correct":22},{"key":28,"text":113,"correct":22},"直上直下，强制切土",{"key":31,"text":45,"correct":22},{"id":116,"libraryId":5,"type":15,"typeLabel":16,"stem":117,"options":118,"answer":31,"analysis":33},893384,"在单层工业厂房结构吊装中，如安装支座表面高度为15.0m（从停机面算起），绑扎点至所吊构件底面距离0.8m部，索具高度为3.0m，则起重机起重高度至少为（ ）m。",[119,121,123,125],{"key":20,"text":120,"correct":22},"18.2",{"key":24,"text":122,"correct":22},"18.5",{"key":28,"text":124,"correct":22},"18.8",{"key":31,"text":126,"correct":26},"19.1",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":24,"analysis":33},893385,"分件吊装法施工的适用范围为（ ）。",[131,133,135,137],{"key":20,"text":132,"correct":22},"常用于焊接球节点网架吊装",{"key":24,"text":134,"correct":26},"常用于单层工业厂房结构吊装",{"key":28,"text":136,"correct":22},"广泛用于土木工程",{"key":31,"text":138,"correct":22},"常用于狭窄场地施工",{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":31,"analysis":33},893386,"施工组织设计的编制原则不包括（ ）",[143,145,147,149],{"key":20,"text":144,"correct":22},"贯彻工厂预制和现场预制相结合的方针，提高建筑产品工业化程度，充分发挥机械效能，提高机械化水平",{"key":24,"text":146,"correct":22},"合理调节季节性施工，实现均衡施工，实现合理的经济技术指标",{"key":28,"text":148,"correct":22},"与质量、环境和职业健康安全三个管理体系有效结合，采取必要的技术管理措施，大力推广绿色施工",{"key":31,"text":150,"correct":26},"收集和熟悉编制施工组织总设计所需的有关资料和图纸，进行项目特点和施工条件调查研究",{"id":152,"libraryId":5,"type":15,"typeLabel":16,"stem":153,"options":154,"answer":31,"analysis":33},893387,"劳动生产率应计算的技术经济评价指标不包括( )。",[155,157,159,161],{"key":20,"text":156,"correct":22},"全员劳动生产率",{"key":24,"text":158,"correct":22},"单位用工",{"key":28,"text":160,"correct":22},"劳动力不均衡系数",{"key":31,"text":162,"correct":26},"工日",{"id":164,"libraryId":5,"type":15,"typeLabel":16,"stem":165,"options":166,"answer":24,"analysis":33},893388,"劳动力不动衡系数是指施工期内（ ）之比。",[167,169,171,173],{"key":20,"text":168,"correct":22},"高峰人数与最少人数",{"key":24,"text":170,"correct":26},"高峰人数与平均人数",{"key":28,"text":172,"correct":22},"平均人数与高峰人数",{"key":31,"text":174,"correct":22},"总用工与平均人数",{"id":176,"libraryId":5,"type":15,"typeLabel":16,"stem":177,"options":178,"answer":24,"analysis":33},893389,"单位工程施工平面图设计的主要依据是（ ）。",[179,181,183,185],{"key":20,"text":180,"correct":22},"工程概况和施工方案",{"key":24,"text":182,"correct":26},"施工方案和施工进度计划",{"key":28,"text":184,"correct":22},"施工进度计划和资源需求计划",{"key":31,"text":186,"correct":22},"资源需求计划和材料半成品堆放场地",{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":24,"analysis":33},893390,"单位工程施工组织设计的编制应在（ ）。",[191,193,195,197],{"key":20,"text":192,"correct":22},"初步设计完成后",{"key":24,"text":194,"correct":26},"施工图设计完成后",{"key":28,"text":196,"correct":22},"招标文件发出后",{"key":31,"text":198,"correct":22},"技术设计完成后",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":28,"analysis":33},893391,"施工组织设计指导施工前的一次性准备和项目施工全过程施工规划、施工技术、资源投入等工作，它具有( )的作用。",[203,205,207,209],{"key":20,"text":204,"correct":22},"战略部署和经济安排",{"key":24,"text":206,"correct":22},"战术安排和经济安排",{"key":28,"text":208,"correct":26},"战略部署和战术安排",{"key":31,"text":210,"correct":22},"战术安排和技术安排",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":20,"analysis":33},893392,"单位工程施工组织设计中最具决策性的核心内容是（ ）。",[215,217,219,221],{"key":20,"text":216,"correct":26},"施工方案设计",{"key":24,"text":218,"correct":22},"施工进度计划编制",{"key":28,"text":220,"correct":22},"资源需求量计划编制",{"key":31,"text":222,"correct":22},"单位工程施工平面图设计",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":20,"analysis":33},893393,"需要编制分部工程施工组织设计的是（ ）。",[227,229,231,233],{"key":20,"text":228,"correct":26},"大型结构构件吊装工程",{"key":24,"text":230,"correct":22},"单位工程",{"key":28,"text":232,"correct":22},"建设项目",{"key":31,"text":234,"correct":22},"群体工程",{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":20,"analysis":33},893394,"单位工程施工组织设计的核心内容是（ ）。",[239,241,243,245],{"key":20,"text":240,"correct":26},"施工方案",{"key":24,"text":242,"correct":22},"进度计划",{"key":28,"text":244,"correct":22},"资源需要量计划",{"key":31,"text":246,"correct":22},"成本计划",{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":31,"analysis":33},893395,"需要编制单位工程施工组织设计的工程项目是（ ）。",[251,253,255,257],{"key":20,"text":252,"correct":22},"工厂整体搬迁工程",{"key":24,"text":254,"correct":22},"新建居民小区工程",{"key":28,"text":256,"correct":22},"拆除工程定向爆破工程",{"key":31,"text":258,"correct":26},"发电厂干灰库烟囱工程",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":31,"analysis":33},893396,"下列施工组织设计内容中，应当首先确定的是（ ）。",[263,265,267,269],{"key":20,"text":264,"correct":22},"施工平面图设计",{"key":24,"text":266,"correct":22},"机具设备需求计划",{"key":28,"text":268,"correct":22},"施工进度计划",{"key":31,"text":240,"correct":26},{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":31,"analysis":33},893397,"把施工所需的各种资源、生产、生活活动场地及各种临时设施合理地布置在施工现场，使整个现场能有组织地进行文明施工，属于施工组织设计中（ ）的内容。",[274,276,277,279],{"key":20,"text":275,"correct":22},"施工部署",{"key":24,"text":240,"correct":22},{"key":28,"text":278,"correct":22},"安全施工专项方案",{"key":31,"text":280,"correct":26},"施工平面图",{"id":282,"libraryId":5,"type":15,"typeLabel":16,"stem":283,"options":284,"answer":31,"analysis":33},893398,"编制施工组织总设计涉及下列工作：①施工总平面图设计；②拟定施工方案；③编制施工总进度计划；④编制资源需求计划；⑤计算主要工种的工程量。正确的编制程序是（ ）。",[285,287,289,291],{"key":20,"text":286,"correct":22},"⑤→①→②→③→④",{"key":24,"text":288,"correct":22},"①→⑤→②→③→④",{"key":28,"text":290,"correct":22},"①→②→③→④→⑤",{"key":31,"text":292,"correct":26},"⑤→②→③→④→①",{"id":294,"libraryId":5,"type":15,"typeLabel":16,"stem":295,"options":296,"answer":28,"analysis":33},893399,"工程制图图幅幅面主要有（ ）种。",[297,298,299,300],{"key":20,"text":89,"correct":22},{"key":24,"text":91,"correct":22},{"key":28,"text":93,"correct":26},{"key":31,"text":301,"correct":22},"6",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":20,"analysis":33},893400,"一套完整的房屋建筑工程图在装订时要按专业顺序排列，一般顺序为（ ）。",[306,308,310,312],{"key":20,"text":307,"correct":26},"图纸目录→建筑设计总说明→总平面图→建筑施工图→结构施工图→给排水施工图→采暖施工图→电气施工图",{"key":24,"text":309,"correct":22},"图纸目录→建筑设计总说明→总平面图→建筑施工图→结构施工图→电气施工图→给排水施工图→采暖施工图",{"key":28,"text":311,"correct":22},"图纸目录→总平面图→建筑设计总说明→建筑施工图→结构施工图→给排水施工图→采暖施工图→电气施工图",{"key":31,"text":313,"correct":22},"图纸目录→总平面图→建筑设计总说明→建筑施工图→结构施工图→电气施工图→给排水施工图→采暖施工图",{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":28,"analysis":33},893401,"关于标高符号说法错误的是（ ）。",[318,320,322,324],{"key":20,"text":319,"correct":22},"标高有绝对标高和相对标高两种不同的表示方法",{"key":24,"text":321,"correct":22},"绝对标高是以我国青岛黄海的平均海平面为绝对标高的零点",{"key":28,"text":323,"correct":26},"相对标高都是以该建筑物的室外地面高度作为0点来计算的",{"key":31,"text":325,"correct":22},"绝对标高一般只用在总平面图上",{"id":327,"libraryId":5,"type":15,"typeLabel":16,"stem":328,"options":329,"answer":31,"analysis":33},893402,"在施工图中，M代表（ ）。",[330,332,334,336],{"key":20,"text":331,"correct":22},"窗",{"key":24,"text":333,"correct":22},"墙",{"key":28,"text":335,"correct":22},"梁",{"key":31,"text":337,"correct":26},"门",{"id":339,"libraryId":5,"type":15,"typeLabel":16,"stem":340,"options":341,"answer":28,"analysis":33},893403,"在A号轴线之后附加的第二根轴线时，正确的是（ ）。",[342,344,346,348],{"key":20,"text":343,"correct":22},"A\u002F2",{"key":24,"text":345,"correct":22},"B\u002F2",{"key":28,"text":347,"correct":26},"2\u002FA",{"key":31,"text":349,"correct":22},"2\u002FB",{"id":351,"libraryId":5,"type":15,"typeLabel":16,"stem":352,"options":353,"answer":24,"analysis":33},893404,"建筑剖视图的剖切位置一般选取在（ ）。",[354,356,358,360],{"key":20,"text":355,"correct":22},"无固定位置",{"key":24,"text":357,"correct":26},"内部结构和构造比较复杂或有代表性的部位",{"key":28,"text":359,"correct":22},"沿横向定位轴线",{"key":31,"text":361,"correct":22},"沿竖向定位轴线",{"id":363,"libraryId":5,"type":15,"typeLabel":16,"stem":364,"options":365,"answer":31,"analysis":33},893405,"《国家建筑标准设计图集》（16G101）平法施工图中，剪力墙上柱的标注代号为（）。",[366,368,370,372],{"key":20,"text":367,"correct":22},"JLQZ",{"key":24,"text":369,"correct":22},"JLQSZ",{"key":28,"text":371,"correct":22},"LZ",{"key":31,"text":373,"correct":26},"QZ",{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":20,"analysis":33},893406,"柱平法施工图的表示方法为（ ）。",[378,380,382,384],{"key":20,"text":379,"correct":26},"列表注写方式和截面注写方式",{"key":24,"text":381,"correct":22},"列表注写方式和平面注写方式",{"key":28,"text":383,"correct":22},"截面注写方式和平面注写方式",{"key":31,"text":385,"correct":22},"截面注写方式和原位注写方式",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":31,"analysis":33},893407,"关于梁平法施工图的注写方式，说法正确的是（ ）。",[390,392,394,396],{"key":20,"text":391,"correct":22},"梁平法施工图分平面注写方式、列表注写方式",{"key":24,"text":393,"correct":22},"原位标注表达梁的通用数值",{"key":28,"text":395,"correct":22},"集中标注表达梁的特殊数值",{"key":31,"text":397,"correct":26},"施工时，原位标注优先于集中标注",{"id":399,"libraryId":5,"type":15,"typeLabel":16,"stem":400,"options":401,"answer":28,"analysis":33},893408,"梁平法施工图的表示方法为（ ）。",[402,403,404,405],{"key":20,"text":379,"correct":22},{"key":24,"text":381,"correct":22},{"key":28,"text":383,"correct":26},{"key":31,"text":385,"correct":22},{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":20,"analysis":33},893409,"下列立面图的图名中错误的是（ ）。",[410,412,414,416],{"key":20,"text":411,"correct":26},"房屋立面图",{"key":24,"text":413,"correct":22},"东立面图",{"key":28,"text":415,"correct":22},"⑦—①立面图",{"key":31,"text":417,"correct":22},"左侧立面图",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":24,"analysis":33},893410,"结构施工图中的圈梁表示（ ）。",[422,424,426,428],{"key":20,"text":423,"correct":22},"GL",{"key":24,"text":425,"correct":26},"QL",{"key":28,"text":427,"correct":22},"JL",{"key":31,"text":429,"correct":22},"KL",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":20,"analysis":33},893411,"不属于多层建筑平面图的是（ ）。",[434,436,438,440],{"key":20,"text":435,"correct":26},"基础平面图",{"key":24,"text":437,"correct":22},"底层平面图",{"key":28,"text":439,"correct":22},"标准层平面图",{"key":31,"text":441,"correct":22},"屋顶平面图",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":20,"analysis":33},893412,"下列拉丁字母中，可以用做定位轴线编号的是（ ）。",[446,448,450,452],{"key":20,"text":447,"correct":26},"L",{"key":24,"text":449,"correct":22},"I",{"key":28,"text":451,"correct":22},"O",{"key":31,"text":453,"correct":22},"Z",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":20,"analysis":33},893413,"假想用一水平面剖切平面沿门窗洞的位置将房屋剖开，然后移去剖切平面和它以上部分向下所作的水平面剖视图叫做（ ）。",[458,460,462,464],{"key":20,"text":459,"correct":26},"建筑平面图",{"key":24,"text":461,"correct":22},"建筑立面图",{"key":28,"text":463,"correct":22},"建筑剖面图",{"key":31,"text":465,"correct":22},"建筑详图",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":28,"analysis":33},893414,"建筑剖面图一般不需要标注（ ）等内容",[470,472,474,476],{"key":20,"text":471,"correct":22},"门窗洞口高度",{"key":24,"text":473,"correct":22},"层间高度",{"key":28,"text":475,"correct":26},"楼板与梁的断面高度",{"key":31,"text":477,"correct":22},"建筑总高度",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":24,"analysis":33},893415,"标注Φ6@200中，以下说法错误的是（ ）。",[482,484,486,488],{"key":20,"text":483,"correct":22},"Φ为直径符号，且表示该钢筋为I级",{"key":24,"text":485,"correct":26},"6代表钢筋根数",{"key":28,"text":487,"correct":22},"@为间距符号",{"key":31,"text":489,"correct":22},"200代表钢筋间距为200mm",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":31,"analysis":33},893416,"按照钢筋受力和作用不同，在钢筋泥凝土构件中没有（ ）。",[494,496,498,500],{"key":20,"text":495,"correct":22},"受力钢筋",{"key":24,"text":497,"correct":22},"分布钢筋",{"key":28,"text":499,"correct":22},"架立钢筋",{"key":31,"text":501,"correct":26},"光滑钢筋",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":28,"analysis":33},893417,"某梁下部纵筋2Φ25+3Φ22(-2)／5Φ25，其表示的含义为（ ）。",[506,508,510,512],{"key":20,"text":507,"correct":22},"上一排纵筋为2Φ25和3Φ22；下一排纵筋为5Φ25，全部伸入支座",{"key":24,"text":509,"correct":22},"上一排纵筋为5Φ25，全部伸入支座；下一排纵筋为2Φ25和3Φ22，其中2Φ22不伸入支座",{"key":28,"text":511,"correct":26},"上一排纵筋为2Φ25和3Φ22，其中2Φ22不伸入支座；下一排纵筋为5Φ25，全部伸入支座",{"key":31,"text":513,"correct":22},"上一排纵筋为5Φ25，全部伸入支座；下一排纵筋为2Φ25和3Φ22",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":20,"analysis":33},893418,"下列不属于建筑立面图图示的内容的是（ ）。",[518,520,522,524],{"key":20,"text":519,"correct":26},"散水构造做法",{"key":24,"text":521,"correct":22},"外墙各主要部位标高",{"key":28,"text":523,"correct":22},"建筑物两端定位轴线",{"key":31,"text":525,"correct":22},"详图索引符号",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":20,"analysis":33},893419,"建筑平面图不包括（ ）。",[530,531,533,535],{"key":20,"text":435,"correct":26},{"key":24,"text":532,"correct":22},"首层平面图",{"key":28,"text":534,"correct":22},"标准平面图",{"key":31,"text":441,"correct":22},{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":20,"analysis":33},893420,"下列标识中，最可能出现在总平面图中的是（ ）。",[540,542,544,546],{"key":20,"text":541,"correct":26},"相邻建筑的位置",{"key":24,"text":543,"correct":22},"墙体轴线",{"key":28,"text":545,"correct":22},"柱子轴线",{"key":31,"text":547,"correct":22},"建筑物总高",{"id":549,"libraryId":5,"type":15,"typeLabel":16,"stem":550,"options":551,"answer":28,"analysis":33},893421,"在《国家建筑标准设计图集》（16G101）梁平法施工中，KL9（6 A）表示的含义是（）。",[552,554,556,558],{"key":20,"text":553,"correct":22},"9跨屋面框架梁，间距为6m，等截面梁",{"key":24,"text":555,"correct":22},"9跨框支梁，间距为6m，主梁",{"key":28,"text":557,"correct":26},"9号楼层框架梁，6跨，一端悬挑",{"key":31,"text":559,"correct":22},"9号框架梁，6跨，两端悬挑",{"id":561,"libraryId":5,"type":15,"typeLabel":16,"stem":562,"options":563,"answer":20,"analysis":33},893422,"某梁代号为KL2（2 A），其表示的含义为（ ）。",[564,566,568,570],{"key":20,"text":565,"correct":26},"第2号框架梁，两跨，一端悬挑",{"key":24,"text":567,"correct":22},"第2号框架梁，两跨，两端悬挑",{"key":28,"text":569,"correct":22},"第2号框支梁，两跨，无悬挑",{"key":31,"text":571,"correct":22},"第2号框架梁，两跨，无悬挑",{"id":573,"libraryId":5,"type":15,"typeLabel":16,"stem":574,"options":575,"answer":28,"analysis":33},893423,"下列表示预应力空心板和构造柱的符号是（ ）。",[576,578,580,582],{"key":20,"text":577,"correct":22},"YB；GZ",{"key":24,"text":579,"correct":22},"YKB；GZZ",{"key":28,"text":581,"correct":26},"Y－KB；GZ",{"key":31,"text":583,"correct":22},"YT；GZZ",{"id":585,"libraryId":5,"type":15,"typeLabel":16,"stem":586,"options":587,"answer":28,"analysis":33},893424,"某框架柱的配筋φ8@100\u002F200，其含义为（ ）。",[588,590,592,594],{"key":20,"text":589,"correct":22},"该框架柱的箍筋为直径8毫米的一级钢筋，钢筋间隔100～200毫米布置",{"key":24,"text":591,"correct":22},"该框架柱的箍筋为直径8毫米的一级钢筋，钢筋每间隔100、200毫米隔一布一",{"key":28,"text":593,"correct":26},"该框架柱的箍筋为直径8毫米的一级钢筋，加密区间隔100毫米布置，非加密区间隔200毫米布置",{"key":31,"text":595,"correct":22},"该框架柱的箍筋为直径8毫米的二级钢筋，加密区间隔100毫米布置，非加密区间隔200毫米布置",{"id":597,"libraryId":5,"type":15,"typeLabel":16,"stem":598,"options":599,"answer":28,"analysis":33},893425,"相对标高的零点正确的注写方式为（ ）。",[600,602,604,606],{"key":20,"text":601,"correct":22},"+0.000",{"key":24,"text":603,"correct":22},"-0.000",{"key":28,"text":605,"correct":26},"±0.000",{"key":31,"text":607,"correct":22},"0.000",[609,612,615,618,621,624],{"id":15,"name":610,"category":7,"favorite":611},"领导干部任职前廉政法规知识测试题",92,{"id":613,"name":614,"category":7,"favorite":15},595,"建筑结构与设备",{"id":616,"name":617,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":619,"name":620,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":622,"name":623,"category":7,"favorite":8},534,"BIM工程师",{"id":625,"name":623,"category":7,"favorite":8},535]